home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V12_5 / V12_572.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  16KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/0bFXqZC00VcJMDTE4T>;
  5.           Sun, 18 Nov 1990 02:52:05 -0500 (EST)
  6. Message-ID: <obFXq2S00VcJ4DRU4B@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Sun, 18 Nov 1990 02:51:32 -0500 (EST)
  12. Subject: SPACE Digest V12 #572
  13.  
  14. SPACE Digest                                     Volume 12 : Issue 572
  15.  
  16. Today's Topics:
  17.               Re: Save our Shuttle data?
  18.                USA 38 Payload Observed
  19.    Summary of responses to "the Ariane V36 failure" (long - sorry)
  20.              Re: LNLL Inflatable Stations
  21.         Re: Reliability and Insurance (3 of 3)
  22.           NASA Prediction Bulletins:  Space Shuttle
  23.  
  24. Administrivia:
  25.  
  26.     Submissions to the SPACE Digest/sci.space should be mailed to
  27.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription notices,
  28.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  29.              tm2b+@andrew.cmu.edu
  30.  
  31. ----------------------------------------------------------------------
  32.  
  33. Date: 17 Nov 90 02:11:30 GMT
  34. From: usc!wuarchive!emory!wa4mei!ke4zv!gary@apple.com  (Gary Coffman)
  35. Subject: Re: Save our Shuttle data?
  36.  
  37. In article <0093FC0D.95D057E0@KING.ENG.UMD.EDU> sysmgr@KING.ENG.UMD.EDU (Doug Mohney) writes:
  38. >What steps could be (are?) taken to preserve the specs and construction
  39. >techniques for the Space Shuttle, especially in the area of the main engines? 
  40. >
  41. >There's been a lot of speculation on what it would take to (re) build a 1990
  42. >Apollo command module or a Saturn V, and the typical answer seems to be "You
  43. >can't; they burned/lost/destroyed/buried the plans." 
  44. >
  45. >I could see us sitting around 15 years from now going "Gosh, the Shuttle SSME,
  46. >with a few minor differences, would be a perfect application." Are the plans
  47. >and specs to SSMEs proprietary? Or are they the property of the U.S.
  48. >government? 
  49. >
  50. >We've "lost" one set of technological plans (Apollo/Saturn) already. Some will
  51. >argue we should be glad to lose the Shuttle whenever it is finally retired, but
  52. >I'd rather see all the data stashed away somewhere gathering dust than 
  53. >"lost."
  54. >
  55. >Maybe we need Leonard Nimoy to do a "In Search of" the Saturn V specifications.
  56. >Are all the engineers who worked on building and designing the F-1 engines
  57. >dead? 
  58.  
  59. We still have the design specs of the F-1 engines. Heck, we even have real
  60. live examples lying around. So what's the problem? The problem is that
  61. many of the parts required special job shop techniques to machine the 
  62. materials to the right tolerances and special heat treatments were required
  63. for some of the materials. Machining special alloys to precise tolerances
  64. requires special techniques that are often specfic to the particular machine
  65. tool used. Sometimes to the very tool and not just any production model of
  66. the tool. The machine operator plays a very major part in this operation.
  67. It's his skill, experience, and most particularly, his "feel" for his
  68. machine that determines the results. Unlike a production line, job shop
  69. machining almost always uses hand controlled machines. Most of the work
  70. for Saturn was done by small job shops under subcontract. Many of these
  71. are out of business. Many of the machine tools used have been consigned
  72. to the scrap heap as worn out or have changed hands at bankruptcy auctions.
  73. Most of the experienced machinists who developed the often undocumented
  74. tricks that made the machining work have long since retired or died.
  75. Some of the specialty metals suppliers who supplied the job shops with
  76. exotic alloys are either out of business or don't make those alloys
  77. anymore.
  78.  
  79. It's not so much that the plans have been lost or destroyed, it's that
  80. the infrastructures needed to execute the plans have been lost. This
  81. is true in many areas of technology. A friend of mine who runs a job
  82. shop remarked that he had almost never seen a set of specs and procedures
  83. come down from the contractor that would actually work. He said every
  84. job requires special tricks devised on the shop floor to actually 
  85. produce an item that meets engineering specs. These tricks are almost
  86. always only documented in the individual machine operator's head and
  87. hands. Often the operator can't say exactly what it is that he is doing
  88. that makes a process work. It's programmed at the reflex level. This
  89. is the major reason we can't make Saturns anymore without a major new
  90. development program where a whole new generation of job shops relearn
  91. the tricks their machines and their batches of special alloys require
  92. to produce the parts.
  93.  
  94. Gary
  95.  
  96. ------------------------------
  97.  
  98. Date: 17 Nov 90 04:21:37 GMT
  99. From: van-bc!ubc-cs!news-server.csri.toronto.edu!utgpu!molczan@ucbvax.Berkeley.EDU  (Ted Molczan)
  100. Subject: USA 38 Payload Observed
  101.  
  102. I have received reports of STS 38 payload sightings tonight by two
  103. observers, working independently on consecutive shuttle passes over the
  104. southern U.S.A..
  105.  
  106. The first sighting, by a Tampa Florida area observer who prefers to
  107. remain anonymous, was at about 18:46 EST (16 Nov 23:46 UTC).  The shuttle
  108. was preceded by 24.1 seconds by a reddish/yellow, magnitude zero satellite.
  109. The observer reported a rapid variation in brightness, from reddish to
  110. golden to yellow-white.  This could be an indication of a rapid spin.  The
  111. spacecraft passed at a 76 deg elevation to the north.
  112.  
  113. The second sighting was by Mike McCants, of Austin Texas, at 19:15 CST
  114. (17 Nov 01:15 UTC).  Mike was observing under very poor sky conditions, but
  115. did see the spacecraft for about 10 seconds through a hole in the clouds.
  116. When the first object came by, he thought it was the shuttle, though
  117. somewhat faint.  Then, the shuttle came by, he realized that the first
  118. object had been the payload.
  119.  
  120. The brightness and colour of the payload are reminiscent of the Lacrosse
  121. radar imaging sat, deployed from Atlantis on STS 27, however it is too
  122. soon to make even a tentative identification.  Further observations are
  123. required.
  124.  
  125. So far, the AV WEEK story on this mission has been very accurate.
  126.  
  127. -- 
  128. Ted Molczan@gpu.utcs.utoronto.ca
  129.  
  130. ------------------------------
  131.  
  132. Date: 17 Nov 90 17:37:09 GMT
  133. From: eagle!news@ucbvax.Berkeley.EDU  (Ronald E. Graham)
  134. Subject: Summary of responses to "the Ariane V36 failure" (long - sorry)
  135.  
  136. This is a summary of responses to the thread entitled "the Ariane V36
  137. failure."  I am grateful to all of the participants in the discussion.
  138. Contributors were:
  139.  
  140. Peter Budgell           peter@engrg.uwo.ca
  141. Henry Spencer           henry@zoo.toronto.edu
  142. Bruce Dunn              a752@mindlink.UUCP
  143. Michael Mraz            mikemr@microsoft.UUCP
  144. Jean-Yves Herve'        herve@urdr.umd.edu
  145. George William Herbert  gwh@monsoon.Berkeley.EDU 
  146.  
  147. The original article read:
  148.  
  149. [regarding the failure of the Ariane V36...]
  150.  
  151. > I hope someone can offer insight on the following questions:
  152. > (1) the failure was due to a piece of cloth.  How could this have been
  153. >     isolated after the failure?
  154. > (2) what is the mechanism by which a piece of cloth was able to cause the
  155. >     failure?  By that I mean
  156. >     - was the cloth of sufficient size/porosity to totally restrict water
  157. >       flow?  or did it have to be?
  158. >     - how is a piece of cloth able to be in the water line anyway?
  159. >     - what is the sequence of events leading to the failure, given the
  160. >       presence of the cloth?
  161. > (3) how can Arianespace ensure no repeat of this mechanism/sequence of
  162. >     events?
  163.  
  164. Per Mr. Spencer and Mr. Dunn, a summary of the sequence of events leading 
  165. to the failure would be:
  166.  
  167. o    the water line to one of the main engines is blocked;
  168. o    chamber pressure drops to that engine;
  169. o    the engine loses thrust;
  170. o    remaining engines gimbal to correct for thrust imbalance;
  171. o    remaining engines go hard-over, but vehicle goes off course anyway;
  172. o    vehicle skids into yaw motion;
  173. o    vehicle breaks up due to aerodynamic loads.
  174.  
  175. Now, Mr. Spencer, Mr. Dunn, and Mr. Mraz all asked the same question: "what
  176. was a water line doing in the propulsion system anyway?"  Mr. Herbert said
  177. he thought it was for cooling engine parts, but Mr. Spencer disagreed.  I
  178. have contacted a couple of folks in my area who are Atlas wizards, and they
  179. did not recognize any comparable water-lines as part of an Atlas.  I am
  180. still looking into it, however, and will report as soon as I learn something.
  181. Atlas uses different engines than the Ariane series, but there's more to it
  182. than that, I'm sure.
  183.  
  184. One similarity between the V36 and the average Atlas: an Atlas can only 
  185. hard-over its engines about 4 degrees, and can only handle yaw motion up
  186. to that point.  The Ariane series is in the same situation.
  187.  
  188. Mr. Dunn references the journal Spaceflight, regarding the determination 
  189. of the cause of the failure:
  190.  
  191. [The article goes on to talk about how debris from the exploded launcher 
  192. fell at the shoreline and just off-shore of the launch site.]  "In particular, 
  193. this search located external tubing of engine D as well as water tank 
  194. elements.  The first stage propulsion bay along with the four Viking motors 
  195. was found.  Despite extremely difficult conditions, the suspect elements 
  196. of the water circuit were recovered shortly before this issue of Spaceflight 
  197. went to press..."
  198.  
  199. "The rag was probably left in the pipe when the tubing was dismantled and 
  200. readjusted during first stage integration before transfer to French Guiana.  
  201. Arianespace Chairman Frederic d'Allest said the cause of the failure was 
  202. 'not only shocking but hard to accept.'"
  203.  
  204. Mr. Herve' points out that the cloth was found "clean," indicating that it
  205. had probably not been used for cleaning and forgotten.  So how did it get
  206. there, then?  Anybody care to comment?
  207.  
  208. Regarding quality control, and ensuring against a repeat failure: Mr. Dunn
  209. again references Spaceflight,
  210.  
  211. "From flight V37, the water line and the N2O4 feed line of each engine will 
  212. be examined.  The inspection will take place at Kourou (launch site in Fr.
  213. Guiana), using a fibroscope type video camera with integrated light source. 
  214. Additional leak checks were made on the first stage and strap-on fuel lines 
  215. to ensure that there was no repeat of the fire on the previous mission.  
  216. Also, new thermal protection inside the propulsion bays of the first stage 
  217. will protect electrical systems in the event of a fire."
  218.  
  219. Mr. Budgell notes a parallel between this situation and Nuclear power
  220. station startups: "all kinds of strange things are said to come out 
  221. of the piping during commisioning - soft drink cans, welder's dams, 
  222. 2 x 4's ..."
  223.  
  224. "During commisioning (of a nuclear power station) they will put screens 
  225. in strategic locations, let water into the piping, and test the pumps.  
  226. The screens are to prevent debris from entering reactors, heat exchanger
  227. tubing, impellers, and so on.  The screens will be checked after
  228. pump tests.  Tool counts, like the QC procedures in operating rooms, 
  229. attempt to prevent things being left behind."
  230.  
  231. Mr. Spencer notes that no single organization was responsible for the 
  232. entire water line.  Management confusion can get in the way both of 
  233. resolving present failures and of preventing new ones.
  234.  
  235. Two final notes: 
  236.  
  237. o    Mr. Dunn comments, "Spaceflight is an excellent journal received 
  238.      by members of the British Interplanetary Society."  The address is
  239.  
  240.           27/29 South Lambeth Road, London, SW8 1SZ, England
  241.  
  242. o    one other response flamed NASA for my attitude, presented in the way
  243.      I asked for responses to these questions.  While I wish I had a 
  244.      nickel for every time somebody flames NASA ;-), I learn a valuable
  245.      lesson: the next time you want thoughtful comments only, ask for 
  246.      them: "thoughtful comments only, please."
  247.  
  248. RG
  249.  
  250. ------------------------------
  251.  
  252. Date: 15 Nov 90 00:26:39 GMT
  253. From: agate!dog.ee.lbl.gov!hellgate.utah.edu!caen!umich!sharkey!cfctech!teemc!fmeed1!cage@ucbvax.Berkeley.EDU  (Russ Cage)
  254. Subject: Re: LNLL Inflatable Stations
  255.  
  256. In article <2732@polari.UUCP> crad@polari.UUCP (Charles Radley) writes:
  257. >That is not the point.   Any material can carry any load, if it has big
  258. >enough cross section.   It is a question of how heavy it has to be to get low 
  259. >enough stress.     Structure carrying centrifugal loads is heavier than 
  260. >structure which does not.
  261.  
  262. Charles, you could easily check this yourself.  If the rotating mass
  263. is 80,000 lbs/half, and it averages 1/2 G, then the total tension is
  264. 40,000 lbs.  If the diameter is 15 feet, then the internal 7.5 psi
  265. pressure exerts a tension of 190,000 lbs, nearly 5 times the load
  266. from centrifugal effects.
  267.  
  268. What really appalls me is that you had similar numbers available
  269. to you from the net, and failed to find your incorrect assertion
  270. before posting.  I hoped for better from you.
  271.  
  272. >  Why exactly do LLNL want to spin the thing anyway ?  I cannot see any
  273. >advantage where crews are rotated every 90 days.  And half the fun for the
  274. >astronauts is the zero-gee....
  275.  
  276. Blinders on again...  Charles, this could easily be another of
  277. those cost-saving measures.  Crews do not *have* to be rotated
  278. every 90 days, which reduces transport (and thus life-cycle) costs.
  279. You keep assuming the weaknesses of NASA's design when talking
  280. about LLNL's design.  This is fallacious thinking.
  281. -- 
  282. Russ Cage    Ford Powertrain Engineering Development Department
  283. Work:  itivax.iti.org!cfctech!fmeed1!cage   (CHATTY MAIL NOT ANSWERED HERE)
  284. Home:  russ@m-net.ann-arbor.mi.us  (All non-business mail)
  285. Member:  HASA, "S" division.
  286.  
  287. ------------------------------
  288.  
  289. Date: Sat, 17 Nov 90 09:38:06 -0500
  290. From: "Allen W. Sherzer" <aws@iti.org>
  291. Subject: Re: Reliability and Insurance (3 of 3)
  292. Newsgroups: sci.space
  293. Cc: 
  294.  
  295. In article <1990Nov16.163309.18249@zoo.toronto.edu> Henry Spencer writes:
  296. >>I know Rockwell was considering a Commercial Shuttle a while back...
  297.  
  298. >The big problem that has hit all attempts at commercializing the shuttle
  299. >is NASA, which does not want to lose control of the program....
  300.  
  301. True, but a good case for it could be made under Title II of the current NASA
  302. authorization bill. Of course, Rockwell would need to push for it in
  303. a very agressive manner but it could be done.
  304.  
  305. The big problem is that none of the aerospace contractors want to piss
  306. off NASA.
  307.  
  308.   Allen
  309. -- 
  310. +---------------------------------------------------------------------------+
  311. |Allen W. Sherzer| I had a guaranteed military sale with ED-209. Renovation |
  312. |   aws@iti.org  | programs, spare parts for 25 years. Who cares if it      |
  313. |                | works or not?  - Dick Jones, VP OCP Security Concepts    |
  314.  
  315. ------------------------------
  316.  
  317. Date: 17 Nov 90 20:13:36 GMT
  318. From: ncis.tis.llnl.gov!blackbird!tkelso@lll-winken.llnl.gov  (TS Kelso)
  319. Subject: NASA Prediction Bulletins:  Space Shuttle
  320.  
  321.  
  322. The most current orbital elements from the NASA Prediction Bulletins are
  323. carried on the Celestial RCP/M, (513) 427-0674, and are updated several times
  324. weekly.  Documentation and tracking software are also available on this
  325. system.  As a service to the satellite user community, the most current
  326. elements for the current shuttle mission are provided below.  The Celestial
  327. RCP/M may be accessed 24 hours/day at 300, 1200, or 2400 baud using 8 data
  328. bits, 1 stop bit, no parity.
  329.  
  330. STS 38     
  331. 1 20935U 90 97  A 90320.40850694  .00161290  68898-5  25599-3 0    47
  332. 2 20935  28.4646 240.6373 0006560 286.7334  43.3613 16.02355418    67
  333. -- 
  334. Dr TS Kelso                           Assistant Professor of Space Operations
  335. tkelso@blackbird.afit.af.mil          Air Force Institute of Technology
  336.  
  337. ------------------------------
  338.  
  339. End of SPACE Digest V12 #572
  340. *******************
  341.